School Of Architecture and the Built Environment UoW

This structured cabling install was made up of 1200 Cat6 cables spread over 3 floors and 3 comms rooms, all linked with a OM4 Fibre optic backbone. We used our Fluke DSX tester to certify the installation that was delivered on time to the client

 
Next
Next

Nexus Fibre Terminations